Hey, I think it would be cool if DB did sign on for a role.
KR, any adjustments to the ep 11 issue? I would like to believe that the G2003 timetable in the ep guide is pretty solid. Looks like the production schedule is thoroughly laid out, and could probably be independently sources from Teamster records, but I am lazy.
__________________
May've been the losing side. I'm still not convinved it was the wrong one.
|